excavator track chain assy

FOB Reference Price:Get Latest Price
US $300-1,300 / Pieces | 1 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Fujian, China (Mainland)
Brand Name:
Red Hill
Model Number:
bulldozer & excavator
Model:
excavator track chain assy
Logo:
Red Hill or as your requirement
Certification:
ISO9001
Suitable:
bulldozer & excavator
Material:
40-50Mn
Technology:
Forging
Heat Treatment:
Yes
Surface hardness:
56-62
Warranty:
6 Months
Color:
Black & Yellow
SupplyAbility
SupplyAbility:
2000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Standard export fumigated wooden pallet.
Port
Xiamen
Lead Time :
Within one month after order confirmed.

Specifications

excavator track chain assy
1. We are manufacturer
2. OEM available
3. Strictly quality control
4. Competitive price

1. Product Introduction

 

excavator track chain assy
  Advantages/Features:

1). Ensure the quality to meet OEM standard
2). Deep hardened wear surface
3). Good quality bronze bushings

4). Well lubricated oil recycle system

5). Certification: ISO9001:2000

6)Pitch :228,216,203,175,171,135

 

 

Details:

Track Chain Assy are best durable produancts resisting any sort of impacts on tracks while it works. Design, selection of material, heat treatment, machining through a long term experience will be pivotal points to distinguish our products with others. Especially, quality products will be produced by well-organized quality system and hard works.

 

Our main products are Track Roller, Top Roller, Sprocket , Idler,Track Linkfor various types of excavator and bulldozer, and all other kinds of spare parts like pin, bushing, high-strength bolt & nut, Link Bucket, Cylinder, Piston, etc.

 

Excavator Track Link Cast sprocket rim and wheels offer these outstanding features:

Homogeneous casting

Precision machining

Deep hardened profiles

Accurate interchangeablity

Reduced down time

Lower maintenance costs

 

Induction hardening, a key-operation uses special design multiple teeth inductors, Hardened area overlapping is thus minimized, eliminating field failure.Differential heat treatment is also introduced on selected items,resulting in sprocket and chain longer wear life.

 

2. Workshop


3.Certificate


4.Quality Control